Production schedule

vector right

Open-Prod contains an advanced and straightforward production scheduling feature. This Computer Aided Manufacturing ERP allows simulation and planning according to available resources by balancing the workload (manufacturing resource planing). It is customizable for each client deadline to optimize production planning for each business deal. You can intervene manually at any time, adding or prioritizing resources in work orders and propagating information through operating ranges.
The planning interface provides the means to keep track of the work orders schedule according to each resource (machine, employee and subcontractor) thanks to a very visual Gantt table showing the workload, delays and raw material availability, operations… You can easily modify the schedule using the “drag and drop” feature.

vector left
video-image
play video

Schedule options

  • Account for levels and sublevels of the Bill of materials
  • Load balancing
  • ASAP / At the latest
  • According to materials availability
round

1

round

2

Tools and parameters

  • Manual editing directly on the visual schedule
  • Manually moving a work order between resources
  • Work time calculation according resource presence and cadence

Manufacturing orders display with indicators of:

  • Raw material availability
  • Available loads
  • Overlapping operations
round

3

round

4

Loads versus capacity display:

  • Resource
  • Resource Categories
  • Period

Visual alert for suspicious problems:

  • Workload
  • Raw material delays
  • Overlapping operations
round

5

round

6

Forecast and projected production plan

  • Projected resource load and cost
  • Projected financial load and cost
  • Projected purchase load and cost
round

1

Schedule options

  • Account for levels and sublevels of the Bill of materials
  • Load balancing
  • ASAP / At the latest
  • According to materials availability
round

2

Tools and parameters

  • Manual editing directly on the visual schedule
  • Manually moving a work order between resources
  • Work time calculation according resource presence and cadence
round

3

Manufacturing orders display with indicators of:

  • Raw material availability
  • Available loads
  • Overlapping operations
round

4

Loads versus capacity display:

  • Resource
  • Resource Categories
  • Period
round

5

Visual alert for suspicious problems:

  • Workload
  • Raw material delays
  • Overlapping operations
round

6

Forecast and projected production plan

  • Projected resource load and cost
  • Projected financial load and cost
  • Projected purchase load and cost
production sequencing and operating ranges
planifier sa production avec un logiciel gpao