Production planning

vector right

Open-Prod contains an advanced and straightforward production scheduling feature. This functionnality allows simulation and planning according to available resources (MRP : Material Ressources planning). It is customizable for each client deadline to optimize production planning for each business deal. You can intervene manually at any time, adding or prioritizing resources in work orders and propagating information through operating ranges. The planning interface provides the means to keep track of the work orders schedule according to each resource (machine, employee and subcontractor) thanks to a visual Gantt table showing the workload, delays and raw material availability, operations… You can easily modify the schedule using the “drag and drop” feature.

vector left
video-image
play video

Options de planification

  • Account for levels and sublevels of the Bill of materials
  • Load balancing
  • ASAP / At the latest
  • According to materials availability
round

1

round

2

Outils et paramètres

  • Manual editing directly on the visual schedule
  • Manually moving a work order between resources
  • Work time calculation according resource presence and cadence

Visualisation des ordres de fabrication avec indicateurs

  • Raw material availability
  • Available loads
  • Overlapping operations
round

3

round

4

Visualisation de la charge versus la capacité 

  • Resource
  • Resource Categories
  • Period

Alerte visuelle concernant les risques

  • Workload
  • Raw material delays
  • Overlapping operations
round

5

round

6

Intégration de prévisionnelles et d'un plan directeur de production (PDP) 

  • Projected resource load and cost
  • Projected financial load and cost
  • Projected purchase load and cost
round

1

Options de planification

  • Account for levels and sublevels of the Bill of materials
  • Load balancing
  • ASAP / At the latest
  • According to materials availability
round

2

Outils et paramètres

  • Manual editing directly on the visual schedule
  • Manually moving a work order between resources
  • Work time calculation according resource presence and cadence
round

3

Visualisation des ordres de fabrication avec indicateurs

  • Raw material availability
  • Available loads
  • Overlapping operations
round

4

Visualisation de la charge versus la capacité 

  • Resource
  • Resource Categories
  • Period
round

5

Alerte visuelle concernant les risques

  • Workload
  • Raw material delays
  • Overlapping operations
round

6

Intégration de prévisionnelles et d'un plan directeur de production (PDP) 

  • Projected resource load and cost
  • Projected financial load and cost
  • Projected purchase load and cost